OUR PROJECTS
2020
RAC Karri Valley Resort - Environmental Industries
Follow design and construct ring roads through carpark. Construct hard stands for caravans. Bituminise designated areas, roundabouts and car parks. Cover batter with top soils. Concrete around curbed areas and install fencing.

2021
Main Roads: Albany Highway - Highway Construction
​
Shoulder widening 176kms. Boxing out to 200mm, topping up utilising side tippers and new material. Sealing.

2021
Bridgetown Skate Park - Environmental Industries
Construct concrete bowls, ramps and carparks. Landscape as designed. Install reticulation.

2021/2022
Main Roads: Bussell Highway - Highway Construction
Shoulder widening 70km, from Carbenup to Margaret River. Boxing out to 200mm, topping up with side tippers and new material. Sealing shoulders.

2021/2022
Main Roads: Coolgardie/Esperance (Emu Rocks) - Highway Construction
50km of full road design and construction. Cut and fill. Installation of drainage and batters. Lift pit material for base coarse and top coat. Condition materials and deliver to site.

2022
Main Roads: Wongan Hills - Highway Construction
Workiong along side stabiliser doing patch work. Full overlay of seal from Great Northern Highway to Wongan Hills.

2022
Main Roads: Great Eastern Highway Upgrade (Walgoolan) Bridge Construction and Abutments - Highway Construction
Full bridge demolition and reconstruction at Walgoolan. Partnered with Album.

2022/2023
Moorine Rock - Highway Construction
Shoulder widening and bridge approaches.

Ongoing
DFES and Local Shire: Fire Mitigation
Providing our services to DFES and local shires for fire mitigation works. This includes heavy duty slashing, mulching, installing and maintaining firebreaks.

2023/2024
Main Roads: Sandstone/ Laverton - Highway Construction
Sub-contracting for Bilung Civil. Shoulder reconditioning on Agnew-Sandstone Rd and Laverton-Leonora Rd.

2023/2024
Great Eastern Highway 16.4 Kms of Highway Rebuild at Bodallin - Highway Construction
Construct temporary traffic lanes North and South of town. Box out unsuitable materials. Import sub-base, sub-grade and base course materials. Using GPS and UTS tracking systems.

2024
Great Eastern Highway Southern Cross to Goolie (Gold Feilds) - Highway Construction
Full road reconstruction using stabilisers and grader to face up and trim.

2024/ 2025
Manuwarra Red Dog Highway Upgrades
Sub-contracting for Yirdiya Pty Ltd/ Garli​

February 2025, Ongoing
Main Roads: South West Highway Shoulder Stabilisation
Sub-contracting for Maali Group PTY LTD. Shoulder reconditioning on the South West Highway Between Manjimup and Walpole.